You don't have javascript enabled. Good luck with that.
Pencarian
Kolam Olakan Dibangun di Jl Boulevard Raya Kelapa Gading

Kelapa Gading Targets to Build 11 Retention Ponds on Jalan Boulevard Raya

The Kelapa Gading Sub-district Water Resources (SDA) has been started building retention ponds, locally known as kolam olakan on Jalan Boulevard Raya, Kelapa Gading, precisely in the front of Kelapa Gading Mall.

We're going to make 11 ponds

Citrin Indriati, Head of Kelapa Gading SDA Executing Unit stated it was done to minimize puddles and floods in the rainy season.

"We're going to make 11 ponds. It has been ongoing since October 2020 and is targeted to be complete in the forthcoming March," she expressed, Wednesday (1/27).

Flood-prone Areas Handling in Central Jakarta Has Reached 90 percent

Thus far her side had built six ponds through 30 personnel. Each had 25 to 35 meters long with 1.5 meters deep. They were made to flow water into the Gading Raya, Kelapa Nias, and BGR Kelapa Gading connecting channels.

"Hopefully it is able to minimize puddles and floods around Jalan Boulevard Raya, Kelapa Gading," she hoped.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye824 personAldi Geri Lumban Tobing
  2. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye574 personDessy Suciati
  3. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye567 personAldi Geri Lumban Tobing
  4. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye564 personAldi Geri Lumban Tobing
  5. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye547 personFakhrizal Fakhri