You don't have javascript enabled. Good luck with that.
Pencarian
Kolam Olakan Dibangun di Jl Boulevard Raya Kelapa Gading

Kelapa Gading Targets to Build 11 Retention Ponds on Jalan Boulevard Raya

The Kelapa Gading Sub-district Water Resources (SDA) has been started building retention ponds, locally known as kolam olakan on Jalan Boulevard Raya, Kelapa Gading, precisely in the front of Kelapa Gading Mall.

We're going to make 11 ponds

Citrin Indriati, Head of Kelapa Gading SDA Executing Unit stated it was done to minimize puddles and floods in the rainy season.

"We're going to make 11 ponds. It has been ongoing since October 2020 and is targeted to be complete in the forthcoming March," she expressed, Wednesday (1/27).

Flood-prone Areas Handling in Central Jakarta Has Reached 90 percent

Thus far her side had built six ponds through 30 personnel. Each had 25 to 35 meters long with 1.5 meters deep. They were made to flow water into the Gading Raya, Kelapa Nias, and BGR Kelapa Gading connecting channels.

"Hopefully it is able to minimize puddles and floods around Jalan Boulevard Raya, Kelapa Gading," she hoped.

Linked News
Popular News indeks
  1. Still Rp 3,500! No Fare Change for Transjakarta’s Kalideres–Soetta Route

    access_time01-08-2026 remove_red_eye559 personAldi Geri Lumban Tobing
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye558 personTiyo Surya Sakti
  3. Jakarta Reaffirms Commitment to Preserving Cultural Heritage

    access_time31-07-2026 remove_red_eye534 personDessy Suciati
  4. East Jakarta Repairs Fire Hydrants Damaged by Component Theft

    access_time31-07-2026 remove_red_eye472 personNurito
  5. Rano Karno Hopes Penjaringan Inspires a Citywide Quranic Movement

    access_time31-07-2026 remove_red_eye424 personBudhi Firmansyah Surapati